Pitch First, Everything Else After
The 282852-2: This pitch is the first dimension to confirm against your PCB hole pattern; the 10.00 mm spacing is standard for industrial control and power distribution layouts, not fine-pitch signal work.
Wiring and Torque — The Termination Reality
The rising cage clamp accepts 12-30 AWG wire. The M3 screw has a specified torque of 0.79 Nm (7.0 Lb-In).
Stacking Multiple Blocks
The interlocking (side) feature lets you snap multiple 2-position blocks together to build a multi-position terminal strip on the same PCB.
